Files, photos and chats
Scans on one drive, photos in WhatsApp, the model on someone’s laptop.
- Missing: Finding the latest version
- Missing: Comparing two dates
Every trade works from the same model, so defects, clashes and hazards get pinned before the next trade covers them
Proof for when money is at stake
Dated 3D evidence of what's really built, to close disputes on the record and back every valuation
Spot slippage while it's still cheap
Compare dated walks side by side and see what stalled, before it turns into a late handover
The site comes to your office
Walk any floor from your desk, cut the site visits and trace damage back to the trade that caused it
The walk is the record
The report builds itself from one 360° walk, no repeat laser scans, and the record stays with the building for its whole life
Live today · 40+ units across 14 Hong Kong locationsNo install, runs in your browser
Trusted by government departments, leading contractors & consultants across Asia and the Middle East
Used by teams in 11 countries, with local-language support where we're on the ground, so capture and help happen in your timezone, not over email at midnight
Teams using SpatialSense
Of construction data processed
Deployed to date
Running across Hong Kong
43+ of them in R&D
You don’t have to choose.
Scans on one drive, photos in WhatsApp, the model on someone’s laptop.
Strong software, built and priced for other markets, supported from another timezone.
Buildings, roads, heritage sites, plants and data centres, if it's a site you can capture it
A real SpatialSense site, walked in 360°, compared across two dates, then checked against the BIM model
One capture changes five things on a project, and here is what each one means for your team
Each one starts with a cost your team already carries, and ends with the part of the platform that removes it
How SpatialSense solves it
How SpatialSense solves it
How SpatialSense solves it
How SpatialSense solves it
How SpatialSense solves it
One dated record of the site, used seven different ways
Track progress against the programme and pin issues before the next trade covers them
Keep roads, tunnels and public works on one dated record, checked against the BIM model
Make the first measured record of a site and rate its condition before restoration starts
Keep an as-built record of plant rooms and services you can walk without a site visit
Measure straight off the point cloud and share it in a browser, nothing to install
Let owners and investors follow the build from overseas, without flying in
Capture pits and haul roads on a schedule and see what changed between surveys
Public works · Contractor · Hong Kong
Walk-based capture only records the moments someone is on site. Pours, lifts and back-fills happen between visits, and once they are covered there is no evidence left. Hong Kong now requires a co-supervision platform on every large public works contract, and its checklist includes checking rebar fixing.
Fixed LiDAR stations on poles and structures scan each working zone every 15 to 30 minutes, day and night, with no operator. Each scan is georeferenced and checked against the design BIM model. Station health is monitored and fixed remotely.
Work that gets covered the same day is still in the record, dated and in position. Deviations show up against the design model, not in photos pieced together later.
Book a free meeting and we'll walk you through it.
Short recordings of SpatialSense at work, from capture to a tracked issue
Now live: book a demo to get access. Capture with no signal, upload when back online
See what changed between scans, and where the build drifts from the model
Stream multi-gigabyte scans straight in the browser
The latest platform release, and every update before it
Book a demo and get 30 days free. We onboard your first site for you